A 136,584 SF Cold Storage facility developed in Mulberry, Arkansas. Sterling provided the foundations, slabs, interior curbs, concrete pavement, sidewalks & curbs.

  • Schedule: August, 2022 to October, 2023

  • Project Total Yardage: 6,100 Yards

  • Foundations included: (151) columns, (64) CIP piers, (3,291 LF) continuous footings & (2,152 LF) CIP walls.

  • Slabs included: 136,584 SF of (4” & 8”) slabs, (16) dock pits & (164) bollards.

  • Interior curbs: (2,621 LF) 12” curb & (648 LF) 48” curb.